Newstest

From Northumberland Climbing
Revision as of 04:00, 29 September 2020 by Ianbirtwistle (talk | contribs) (Created page with "<div class="mainpage_box"><h3><span class="header_icon" aria-hidden="true" role="presentation">20px|middle|link=</span><span> <!--T...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

News

2020-10-23
Security The contractors conducting the felling have either ‘got behind’ or under estimated the volume of work involved and are going to be working Saturdays. So, until the works are concluded, which is estimated to be the end of October, it is Sundays only at Kyloe In. As ever avoid any machinery and log piles when you’re in there.
2020-10-23
Security Timber operations have commenced in front of Kyloe In. This work restricts access to the crag during the week. Access at the weekends is OK. The work should be finished by the end of October, until then do not visit the crag during weekdays. While it’s stating the obvious, be careful around the log stacks and avoid any equipment etc.
2020-10-20
Resolved Queens access access as previously described is OK. One of the residents in the bungalows is the suspected source of the ‘rumour’. The requirement to call in at the farm remains waived. There are two areas to park at. The first is on the level ground before the descent to the gate, the second after the gate. Either can be used.
2020-09-15
Access Report that the ‘Landowner’ rather than the farmer at Queens Crag is going to start clamping cars, access rep investigating. In the interim please do not go to Queens Crag.
2020-08-30
Security Lots of cattle and calves in the field on way to Back Bowden. Be very careful when crossing with bouldering pads!
More news F icon.svg